solidification agent - total solution to improve soft ground
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- South Korea
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Category
- Other Constructions
HNT Environment Construction Development
- Verified Certificate
-
8
Product name | solidification agent - total solution to improve soft ground | Certification | - |
---|---|---|---|
Category | Other Constructions | Ingredients | - |
Keyword | building materials , soft ground , solidification agent | Unit Size | - |
Brand name | - | Unit Weigh | - |
origin | South Korea | Stock | - |
Supply type | - | HS code | - |
Product Information
solidification agent - total solution to improve soft ground
│ DESCRIPTION │
This is a product of
<total solution to improve soft ground>
allowing you to from manufacture‧produce solidification agent and improve, design and construct soft ground, of course, but also immediately confirm stability test results on the spot.
Stabilized soil construction material produced by our patented method is excellent in competitiveness as it can achieve the solidity which is equal to concrete products, and is cheaper by 30% in price. Especially, it allows you to save transportation cost that you would pay when you transport construction material from a stony mountain to the construction site as soils in-situ can be used as a main ingredient and you can also effectively shorten the construction period.
As a method of tramping and layering soil after stirring local soil into solidification agent at the mixing ratio as instructed by professionals after performing a test on the soil in-situ (soil test), it displaces soft ground for construction by designing and constructing a subterranean wall and top-base considering an underground water level and design N value.
This patented method is a complex foundation method with shallow foundation safe against bearing capacity and ground settlement by displacing soft ground to the depth stable for design load and design subsidence with high-strength, high-elasticity stabilized mat foundation and installing top pile foundation (50cm) where necessary.
It increases bearing capacity and reduces ground settlement by constructing an subterranean wall to improve dynamic weakness of soil and stabilized mats by inducing floating foundation step by step and also is equipped with cutoff wall function to induce the stability of pavement by absorbing and reducing vibration of traffic load. This is an efficient and economical way to shorten the construction period by approximately 30~70% and also save the construction cost by 20~50% compared with conventional method. Our patented method allows you to immediately confirm the construction results on the spot by conduction the plate load test right after the construction is completed.
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- Lee Kee Seung
- Address
- 89, Sangmupyeonghwa-ro, Seo-gu, Gwangju, Republic of Korea
- Product Category
- Other Constructions
- Year Established
- 2007
- No. of Total Employees
- 1-50
- Company introduction
-
Welcome to our minisite. Here you can find information about our products. You can also send us inquiries and post comments about our company and products. We hope you enjoy your visit. Thank you.
- Main Markets
-
Indonesia
Malaysia
Myanmar
Viet Nam
- Main Product
Related Products
Prefabricated Building Systems
Thermal Bench
Open Type Spring Mount (SMA)
Close Type Spring Mount (SMB)
SmileClouds Machine