solidification agent - total solution to improve soft ground


Negotiable Min Order Quantity Unit

Required Quantity
Place of Origin
South Korea
Payment Terms
Negotiable
Production method
Negotiable
Shipping / Lead Time
Negotiable / Negotiable
Keyword
building materials, soft ground, solidification agent
Category
Other Constructions

HNT Environment Construction Development

Membership
VIP
Country / Year Established
South Korea South Korea / 2007
Business type
Others
Verified Certificate

8

DUNS

Product name solidification agent - total solution to improve soft ground Certification -
Category Other Constructions Ingredients -
Keyword building materials , soft ground , solidification agent Unit Size -
Brand name - Unit Weigh -
origin South Korea Stock -
Supply type - HS code -

Product Information


solidification agent - total solution to improve soft ground




│ DESCRIPTION │


This is a product of
<total solution to improve soft ground>
allowing you to from manufacture‧produce solidification agent and improve, design and construct soft ground, of course, but also immediately confirm stability test results on the spot.

Stabilized soil construction material produced by our patented method is excellent in competitiveness as it can achieve the solidity which is equal to concrete products, and is cheaper by 30% in price. Especially, it allows you to save transportation cost that you would pay when you transport construction material from a stony mountain to the construction site as soils in-situ can be used as a main ingredient and you can also effectively shorten the construction period.

As a method of tramping and layering soil after stirring local soil into solidification agent at the mixing ratio as instructed by professionals after performing a test on the soil in-situ (soil test), it displaces soft ground for construction by designing and constructing a subterranean wall and top-base considering an underground water level and design N value.
This patented method is a complex foundation method with shallow foundation safe against bearing capacity and ground settlement by displacing soft ground to the depth stable for design load and design subsidence with high-strength, high-elasticity stabilized mat foundation and installing top pile foundation (50cm) where necessary.
It increases bearing capacity and reduces ground settlement by constructing an subterranean wall to improve dynamic weakness of soil and stabilized mats by inducing floating foundation step by step and also is equipped with cutoff wall function to induce the stability of pavement by absorbing and reducing vibration of traffic load. This is an efficient and economical way to shorten the construction period by approximately 30~70% and also save the construction cost by 20~50% compared with conventional method. Our patented method allows you to immediately confirm the construction results on the spot by conduction the plate load test right after the construction is completed.

B2B Trade

Price (FOB) Negotiable transportation -
MOQ Negotiable Leadtime Negotiable
Payment Options Negotiable Shipping time Negotiable

HNT Environment Construction Development

Country / Year Established
South Korea South Korea / 2007
Membership
VIP
Business type
Others

8

DUNS

President
Lee Kee Seung
Address
89, Sangmupyeonghwa-ro, Seo-gu, Gwangju, Republic of Korea
Product Category
Other Constructions
Year Established
2007
No. of Total Employees
1-50
Company introduction
Welcome to our minisite. Here you can find information about our products. You can also send us inquiries and post comments about our company and products. We hope you enjoy your visit. Thank you.
Main Markets

Indonesia Indonesia

Malaysia Malaysia

Myanmar Myanmar

Viet Nam Viet Nam

Main Product

Related Products

Other buyers also search

Membership Grade

BUYER

Biz Pro VIP

SELLER

Biz Pro VIP
팝업닫기
Live Chat A new message arrives
from a business partner.

No Data

  • There is no data to load
  • Check out the My TK > My Inquiries list.
  • After agreeing to the use of the Live Chat service, the list is printed only when there is at least one history of receiving or sending a Live Chat request.

If you have not yet agreed to use the Live Chat service,

You can use the Live Chat freely after agreeing to the use of the Live Chat service.

View more
View more