-
- South Korea / 2000
Prefabricated Light Weight Steel Building
- ◾ Price: $ 1 / 40' HQ Container Negotiable
- ◾ MOQ: 1 40' HQ Container Negotiable
Prefabricated Light Weight Steel Building
- ◾ Price: $ 1 / 40' HQ Container Negotiable
- ◾ MOQ: 1 40' HQ Container Negotiable
-
Pre-engineered Steel Structure System for Easy On-site Bolt Assembly
-
Cost-Effective Steel System for Factory, Warehouse, Barn & Sports
-
Required Quantity
-
Brand name-
-
Shipping / Lead TimeNegotiable / Negotiable
-
Keyword
-
Category
Specifications
| Size | 300 * 65 * 12,000 mm | Weight | 133,200 g | Stock | 999,999 40' HQ Containers |
|---|---|---|---|---|---|
| Country of Origin | South Korea | ||||
| Production method | OBM | ||||
Trade Terms
| Payment Terms | D/P, T/T | ||||
|---|---|---|---|---|---|
| Price(FOB) | $ 1 / 40' HQ Container | Negotiable | MOQ | 1 40' HQ Container | Negotiable | ||
| Transportation | Ocean Shipping | ||||
| Lead time | Negotiable | Shipping time | Negotiable | ||
Company
-
Country / Year Established
-
Membership
- VIP
Business typeManufacturer
-
Verified Certificate
-
18
-
18
Product Description
Key Features
• Localized Engineering
• High Quality System
• Excellent Economical Efficiency
Product Catalog / Brochure / Spec Sheet
Prefabricated Light Weight Steel Building
│ Description │
1. Localized Engineering
• Designs tailored to meet the specific environmental conditions(wind, snow, seismic loads) of each country.
• Tailored to your scale. Price is based on size and specifications.
2. High Quality System
• Complete prefabricated steel framing structure constructed by cutting-edge program with automated designing and producing
• Additional coating finish is unnecessary due to the excellent durability obtained by using hot-dip galvanized iron(HGI)
3. Excellent Economical Efficiency
• It is designed to maximize the member stiffness so as to minimize the amount of members
• Weight lightening allows minimization of fundamental frame structures
• Minimize labor cost because no need to use skilled operators. Very easy for unskilled operator
• Minimize the construction period by removing the processing work such as cutting in the construction field but by using bolts instead.
• Prompt, precise and perfectly constructed buildings we create, for example, in the size 330 - 500 m² of buildings, it only takes 5-7 days from order to production and construction
• Steel Frame (DIS) : 1-2 days, Finishing (Panel) : 4-5 days
• Constructible without heavy equipments required for delivery operation
4. Perfect Techinical Support
• Provides perfect structural calculation and steel frame drawing
• Provides perfect prefabrication work; construction design drawing; order sheet, as well as technical support from the head office
5. Prompt Supply
• About 1,000 m² of factory daily yields products in the quantity for a building
• Production time is short due to the automatic production line so the supply dead-line is flexible








