Air Compressor Parts (Acetrap)
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Keyword
- Category
- Air-Compressors & Parts
ACE Corp.
- Verified Certificate
-
16
Product name | Air Compressor Parts (Acetrap) | Certification | - |
---|---|---|---|
Category | Air-Compressors & Parts | Ingredients | - |
Keyword | - | Unit Size | - |
Brand name | - | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | - |
Product Information
Function
Quick installation
Various application
On mouse asterisked You can see the explanation
|
Specs
Technical Data
SPcification Model |
Size(mm)
|
Pressure |
Temp
°C |
Volume
(Liter/hr) Normal/Peak |
Application
m³/min (Compressor) |
Weight
(Kg) |
||||
Inlet
|
Cutlet
|
A
|
B
|
|||||||
Acetrap 15 (L,N,H)
Acetrap 15 (L,N,H)C |
1/2"
|
3/8"
|
105
|
18
|
0.8-3
|
L
|
0~60
|
3/15
|
50
|
1.2
|
3~9.9
|
N
|
|||||||||
10~16
|
H
|
|||||||||
Acetrap 20 (L.N.H)
Acetrap 20 (L.N.H)C |
3/4"
|
1/2"
|
129
|
210
|
0.8~3
|
L
|
0~60
|
6/30
|
130
|
2.3
|
3~9.9
|
N
|
|||||||||
10~16
|
H
|
Caution
- Purchasing order, please note an "L" or "N" of applicable pressure.
- In addition Oil-free type is marked "C"
Diagram
|
Outlook
|
Filter Set Mesh hole |
Heater 220V, 1Phase, 120W/h |
Caution
- Connecting outlet linem please use pipe line over 10mm inner size without back pressure.
Caution For stable installation, be sure to install balance line and use 8~10mm bronze pipe or high pressure hose. Connect blance line "T" from gauase at service tank like above picture. Application Air receiver tank, Turbo inter-cooler, after-cooler and head. |
|
Caution In the case of reciprocation compressorm, use flexble hose at point of inlet due to severe vibration. Application After-cooler, medium and large dryer, large filter and head. |
|
Caution In the case of condensate inlet is so low to the ground, be sure to use balance line, If not, it only be functioned by test key without automatic discharge condensate Application Service tank which inlet is so low to the ground. |
HEATER
ACETRAP insatalled in service Vessel
Caution in maintenence
Attention
Before doing maintenance, depressurise the housing by push test key as it is always under pressure
Maintenance parts
- Ball float set : 1, 2, 3
- Test key set : 6
- Discharge set : 5
- Air chamber set : 4
- Etc overhauling set
- Please require the other sets except above parts to our sales agency or Ace corp.
- Information for shuttle valve parts exchange.
- If drain operate considerable times, you should exchange shuttle valve including discharge sets because shuttle valve coated by NBR or VITON rubber.
Trouble shooting
Type of truble
|
Cause
|
Solution
(Mark means only expert) |
No discharge
|
No pressure
|
Refill pressure
|
Condensate don't come in
|
Reinstall based on principla (check balance line and slope)
|
|
Blocked in inlet line
|
Cleaning inlet
|
|
Leaking
|
Blocked in inlet line
|
Cleaning pilot line by depart relevent parts
|
Out of life in wearing parts
|
Call to concerned person
|
Please get ready for winter season
- During winter, we would like to recommend to install Heater manufactured by Ace corp. because ball float can be distorted in freezing-up, In that case, we can't offer free charge of service.
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- CHO WOON JAE
- Address
- 1052-10 Hwamok-dong,, Gimhae-si,Gyeongsangnam-do,
- Product Category
- Valves
- No. of Total Employees
- 1-50
- Company introduction
-
Ace corp. has dedicated innovative products with continuous developments to the customer's satisfaction. High quality, low price, no-need electricity is our targets and we have developed a perfect mechanism with simplicity through long period.
The best feature of Acetrap is simple mechanism with ball float sensing the level of condensate and controlling pilot air in the housing. When the shuttle valve is pulled back by depressurized pilot air, the condensate is drained out though a large discharge nozzle.
We have involved in condensates draining technique in compressed air for almost ten years covering R&D, manufacturing lines, marketing & after sales service. We offer a full range of solutions to your plants in condensate draining problems.
- Main Markets
-
Germany
Netherland
- Main Product
Related Products
Water Separator for Air Compressor
CENTRIFUGAL WATER CHILLER
AIRREX OILLESS AIR COMPRESSOR
Air man air compressor PDS750
NeX- A SERIES(OIL INJECTION SCREW)