mtr overhead china movable scaffolding system equipment

  • ◾ Price: Negotiable
  • ◾ MOQ: Negotiable

Specifications

Size - Weight - Stock -
Country of Origin China
Production method Negotiable

Trade Terms

Payment Terms T/T
Price(FOB) Negotiable MOQ Negotiable
Transportation -
Lead time Negotiable Shipping time Negotiable

Company

  • Country / Year Established
    • China
    • China / 2008
  • Membership
    • PRO
    Business type
    Manufacturer
  • Verified Certificate
    • 9
  • Main Export Markets
    • Algeria Algeria
    • Armenia Armenia
    • Bangladesh Bangladesh
    • Egypt Egypt
    • India India

Product Description

Product description:

 

500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction is a construction machine used for building cast-in-situ concrete bridges. Due to high-quality construction, easy operation, low cost and other characteristics, it is extensively used for continuous bridge construction in highways and railways, which is considered as a state-of-the-art construction method. The bridge building equipment is mainly composed of support legs, truss, internal and external framework and a lifting system.


The structural components of formwork traveller system are designed with optimized weights. The movable scaffolding systems can be designed as underslung or overhead type to adapt to many bridge cross-sections, including single box girder, double or triple box girder, U-section, etc.. The whole system is designed so that it can be easily assembled and adjusted during operation to variations in segment length, section height, web thickness and deck width.


Our company:

Huada Heavy Industry is a big enterprise specialized in researching, developing, producing and exporting. 

It mainly produces Provide customized service 500 ton mobile boat lift gantry crane for sale and all kinds of accessories, which widely cover machinery, metallurgy, electric power, railway, water conservancy, ports, terminals and other industries. 

Huada Heavy Industry has more than 600 staff, and covers 200,000 square meters.
Our advantages:
1.More than 50 R&D personnels with advanced Science and technology.
2.More than 400 sets advanced Production processing equipment and inspection equipment
3.Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist
4.Obtain ISO 9001 certificate and more than 10 series of patent certificates
5.Efficient service and competitive products
6.Export more than 100 countries


Our service:

1) 14 months warranty when products leave the factory, or 12 months warranty after installation and commissioning in addition to the human damage factors. 
2) 2 years spare-parts provided for better maintenance. 
3) Professional technical staffs provide installation, commissioning and training services. The installation team can be sent to local site to install for customer. 
4) Delivery with English user manual, parts manual, product certification and other relevant certificates. 
5) Technical advisory for any time. 
6) Test before shipment.


Packing: 
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying.
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

 

Delivery: 
1. If the size of whole crane are suitable for container ship, usually by container. 
2. If the size is too big, usually by bulk ship or by container after truncation. 
3. Transport ways are based on reducing cost for you and keep the crane performance!  


FAQ:

1. What,s the information should I provide when inquiry about the 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
1.1 we need the Bridge Drawing.
1.2 The Precast Segmental drawing.

1.3 How many tons of the cast in situ concrete girder.

 

2. What's the bridge erection method of the 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
It is erection by span by span cast in situ method.

 

3. What are inspection standard for load test of 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
3.1 Dynamic load test 
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat. 
3.2 Static load test 
1.25 times rated load, all mechanisms work well, the crane stops 20-30 min as trial load is lifted 10 cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation.

 

4. What is the Launching Mechanism of the 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
it is by hydraulic.

 

5. What is the Production Cycle time? 
It is about 8~14 days depend on site condition, machinery capacity, pier height, reinforcement fabrication method and internal forming system used.

 

 


Product description:

 

500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction is a construction machine used for building cast-in-situ concrete bridges. Due to high-quality construction, easy operation, low cost and other characteristics, it is extensively used for continuous bridge construction in highways and railways, which is considered as a state-of-the-art construction method. The bridge building equipment is mainly composed of support legs, truss, internal and external framework and a lifting system.


The structural components of formwork traveller system are designed with optimized weights. The movable scaffolding systems can be designed as underslung or overhead type to adapt to many bridge cross-sections, including single box girder, double or triple box girder, U-section, etc.. The whole system is designed so that it can be easily assembled and adjusted during operation to variations in segment length, section height, web thickness and deck width.


Our company:

Huada Heavy Industry is a big enterprise specialized in researching, developing, producing and exporting. 

It mainly produces Provide customized service 500 ton mobile boat lift gantry crane for sale and all kinds of accessories, which widely cover machinery, metallurgy, electric power, railway, water conservancy, ports, terminals and other industries. 

Huada Heavy Industry has more than 600 staff, and covers 200,000 square meters.
Our advantages:
1.More than 50 R&D personnels with advanced Science and technology.
2.More than 400 sets advanced Production processing equipment and inspection equipment
3.Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist
4.Obtain ISO 9001 certificate and more than 10 series of patent certificates
5.Efficient service and competitive products
6.Export more than 100 countries


Our service:

1) 14 months warranty when products leave the factory, or 12 months warranty after installation and commissioning in addition to the human damage factors. 
2) 2 years spare-parts provided for better maintenance. 
3) Professional technical staffs provide installation, commissioning and training services. The installation team can be sent to local site to install for customer. 
4) Delivery with English user manual, parts manual, product certification and other relevant certificates. 
5) Technical advisory for any time. 
6) Test before shipment.


Packing: 
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying.
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

 

Delivery: 
1. If the size of whole crane are suitable for container ship, usually by container. 
2. If the size is too big, usually by bulk ship or by container after truncation. 
3. Transport ways are based on reducing cost for you and keep the crane performance!  


FAQ:

1. What,s the information should I provide when inquiry about the 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
1.1 we need the Bridge Drawing.
1.2 The Precast Segmental drawing.

1.3 How many tons of the cast in situ concrete girder.

 

2. What's the bridge erection method of the 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
It is erection by span by span cast in situ method.

 

3. What are inspection standard for load test of 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
3.1 Dynamic load test 
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat. 
3.2 Static load test 
1.25 times rated load, all mechanisms work well, the crane stops 20-30 min as trial load is lifted 10 cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation.

 

4. What is the Launching Mechanism of the 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
it is by hydraulic.

 

5. What is the Production Cycle time? 
It is about 8~14 days depend on site condition, machinery capacity, pier height, reinforcement fabrication method and internal forming system used.

 

 


Product description:

 

500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction is a construction machine used for building cast-in-situ concrete bridges. Due to high-quality construction, easy operation, low cost and other characteristics, it is extensively used for continuous bridge construction in highways and railways, which is considered as a state-of-the-art construction method. The bridge building equipment is mainly composed of support legs, truss, internal and external framework and a lifting system.


The structural components of formwork traveller system are designed with optimized weights. The movable scaffolding systems can be designed as underslung or overhead type to adapt to many bridge cross-sections, including single box girder, double or triple box girder, U-section, etc.. The whole system is designed so that it can be easily assembled and adjusted during operation to variations in segment length, section height, web thickness and deck width.


Our company:

Huada Heavy Industry is a big enterprise specialized in researching, developing, producing and exporting. 

It mainly produces Provide customized service 500 ton mobile boat lift gantry crane for sale and all kinds of accessories, which widely cover machinery, metallurgy, electric power, railway, water conservancy, ports, terminals and other industries. 

Huada Heavy Industry has more than 600 staff, and covers 200,000 square meters.
Our advantages:
1.More than 50 R&D personnels with advanced Science and technology.
2.More than 400 sets advanced Production processing equipment and inspection equipment
3.Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist
4.Obtain ISO 9001 certificate and more than 10 series of patent certificates
5.Efficient service and competitive products
6.Export more than 100 countries


Our service:

1) 14 months warranty when products leave the factory, or 12 months warranty after installation and commissioning in addition to the human damage factors. 
2) 2 years spare-parts provided for better maintenance. 
3) Professional technical staffs provide installation, commissioning and training services. The installation team can be sent to local site to install for customer. 
4) Delivery with English user manual, parts manual, product certification and other relevant certificates. 
5) Technical advisory for any time. 
6) Test before shipment.


Packing: 
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying.
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

 

Delivery: 
1. If the size of whole crane are suitable for container ship, usually by container. 
2. If the size is too big, usually by bulk ship or by container after truncation. 
3. Transport ways are based on reducing cost for you and keep the crane performance!  


FAQ:

1. What,s the information should I provide when inquiry about the 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
1.1 we need the Bridge Drawing.
1.2 The Precast Segmental drawing.

1.3 How many tons of the cast in situ concrete girder.

 

2. What's the bridge erection method of the 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
It is erection by span by span cast in situ method.

 

3. What are inspection standard for load test of 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
3.1 Dynamic load test 
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat. 
3.2 Static load test 
1.25 times rated load, all mechanisms work well, the crane stops 20-30 min as trial load is lifted 10 cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation.

 

4. What is the Launching Mechanism of the 500t highway and mtr overhead china movable scaffolding system equipment crane for bridge construction(MSS)? 
it is by hydraulic.

 

5. What is the Production Cycle time? 
It is about 8~14 days depend on site condition, machinery capacity, pier height, reinforcement fabrication method and internal forming system used.

 

 

Membership Grade

BUYER

Biz Pro VIP

SELLER

Biz Pro VIP
팝업닫기
Live Chat A new message arrives
from a business partner.

No Data

  • There is no data to load
  • Check out the My TK > My Inquiries list.
  • After agreeing to the use of the Live Chat service, the list is printed only when there is at least one history of receiving or sending a Live Chat request.

If you have not yet agreed to use the Live Chat service,

You can use the Live Chat freely after agreeing to the use of the Live Chat service.

View more
View more