PST (Parallel Seismic Tester)
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- South Korea
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Keyword
- pile integrity, seismic wave, hammer energy
- Category
- Other Measuring & Gauging
MISUNG C&S INSPECTION CO.,LTD
- Verified Certificate
-
16
Product name | PST (Parallel Seismic Tester) | Certification | - |
---|---|---|---|
Category | Other Measuring & Gauging | Ingredients | - |
Keyword | pile integrity , seismic wave , hammer energy | Unit Size | - |
Brand name | - | Unit Weigh | - |
origin | South Korea | Stock | - |
Supply type | - | HS code | - |
Product Information
This test is to figure out the degree of defect and existence of pile about pile constructed at foundation part of upper structure. This is a method testing as hitting upper structure when it's impossible to hit the pile head and foundation part and seismic waves are transmitted to reception sensor(Hydrophone) in tube through pile. So it can help analyze the arrival time of signal of seismic waves and can test the pile state
Specifications
• Overall dimensions : 174×50×210mm
• Unit weight : 1.5kg
• System
- Signal Acquisition : 20kHz, 16bit, pre-trigger, Auto gain
- Power : 12V built in battery (operation time : 10 hours)
• Sensor
- Hammer : built in high sensitivity sensor
- Reception Probe : 10 through 100kHz reception band width and waterproof connector
Range of application and use
• Testing for pile existence, embedded depth and defects in completed structures
• Foundation analysis that can't be checked due to surrounding conditions like excavation
• Estimation of pile integrity
Features
• Estimation of the pile length by velocity of parallel seismic waves
• Inspection hole should be drilled about 5m deeper than expected embedded depth of piles and give impacts to the structure with hammer from the foundation bottom, which causes seismic waves and reception probe receives them
• Possibility to measure piles up to 10m from the side of structures (It depends on soil conditions)
• Possibility to measure piles up to 100m in length (In case the distance between the structure and pile is optimal)
• Data acquisition, storing and analysis on site
• Data storing, transmission and program update using SD card
• Light and portable size
• Estimation of pile condition by analysis program
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- KIM SUNG
- Address
- 1351, Nakdongnam-ro, Saha-gu, Busan 604-853, KOREA
- Product Category
- Other Measuring & Gauging
- Year Established
- 1995
- No. of Total Employees
- 1-50
- Company introduction
-
Misung C&S Inspection Co., Ltd. specializes in safety diagnosis of structures in Korea and develops equipment for diagnosis. We are authorized by the Korean government and perform non-destructive testing, geophysical exploration, analysis of foundation elements, geological land and marine survey, quality testing of architecture and civil engineering, and structural analysis. We carry out a wide range of tests and inspections for diagnosis of structure and evaluation of construction conditions. We also have been constantly making a special study for technology development as to bridges, weak ground, tunnel and quality test of structures. Especially, we have professional technology and patents required in the field of foundation element investigation and steel structures investigation.
- Main Markets
-
Algeria
China
Mongolia
Thailand
- Main Product
Related Products
Topcon GTS 603 Electronic Total Station
LOADCELL-CBSS-Ex p (SHEAR BEAM TYPE)
GPS Data Logger for 3G Network
Modbus Device Recorder
YS6010 Benchtop Spectrophotometer