【YBS Nozzle】offer CX hollow cone spray nozzle and other products.
Overpressure rupture disc alarm and electrical systems with the highest level of explosion-proof electrical components ; make a whole set of equipment of the same type than imports more advanced spray drying tower spray drying granulation process : First, the slurry was milled in good further stirred tank is heated to above stir and 35 ℃, and then apply pressure to a stirred tank , under the pressure of the slurry is sent to the atomizer , atomizer atomizer spray after the tower from the bottom into the tower body. The gas turbine is sent to the heat exchanger top of the tower gas
Dispenser , after gas distributor uniformly form the tower into the cyclone -shaped , the atomized slurry was granulated and dried . After the pellets and the hot gas contact surface of the liquid will evaporate quickly , and the internal gas in a subsequent drying process to migrate to the surface of the hot gas is taken away . The dried pellets fall to the bottom of the tower , be recovered through a pair of gap-type butterfly valve . After drying the slurry gas containing a small amount of hexane, and after vaporization of fine dust , the gas is supplied to the first cyclone pressure blower , wherein the preliminary separation of dust , condensation , and then supplied to a column leaching . In the leaching tower , get into the gas sufficiently washed with hexane and the gas contained in the gas is condensed , collected in the bottom of the elution column , washed again through the gas oil is sent to a heat exchanger for heating a gas , are repeated use . During operation the system remains slightly positive pressure state by a delivery valve and one exhaust valve automatic control.
YBS would like to provide you the nozzle design ,samples and catalogue for free.
Ordering information of CX hollow cone spray nozzle(One-piece cast type) (YBS brand)
Thread: B=BSPT
Materials: None=brass
I=cast iron
SS=316 stainless steel
1 B1CX-7 B1CX-I7 B1CX-SS7
B1CX-8 B1CX-I8 B1CX-SS8
B1CX-9 B1CX-I9 B1CX-SS9
B1CX-10 B1CX-I10 B1CX-SS10
B1CX-12 B1CX-I12 B1CX-SS12
B1CX-15 B1CX-I15 B1CX-SS15
1-1/4 B1-1/4CX-10 B1-1/4CX-I10 B1-1/4CX-SS10
B1-1/4CX-12 B1-1/4CX-I12 B1-1/4CX-SS12
B1-1/4CX-14 B1-1/4CX-I14 B1-1/4CX-SS14
B1-1/4CX-16 B1-1/4CX-I16 B1-1/4CX-SS16
B1-1/4CX-20 B1-1/4CX-I20 B1-1/4CX-SS20
1-1/2 B1-1/2CX-16 B1-1/2CX-I16 B1-1/2CX-SS16
B1-1/2CX-20 B1-1/2CX-I20 B1-1/2CX-SS20
B1-1/2CX-25 B1-1/2CX-I25 B1-1/2CX-SS25
B1-1/2CX-30 B1-1/2CX-I30 B1-1/2CX-SS30
2 B2CX-30 B2CX-I30 B2CX-SS30
B2CX-35 B2CX-I35 B2CX-SS35
B2CX-40 B2CX-I40 B2CX-SS40
B2CX-45 B2CX-I45 B2CX-SS45
B2CX-50 B2CX-I50 B2CX-SS50
B2CX-60 B2CX-I60 B2CX-SS60
2-1/2 B2-1/2CX-60 B2-1/2CX-I60 B2-1/2CX-SS60
B2-1/2CX-70 B2-1/2CX-I70 B2-1/2CX-SS70
B2-1/2CX-80 B2-1/2CX-I80 B2-1/2CX-SS80
B2-1/2CX-90 B2-1/2CX-I90 B2-1/2CX-SS90
B2-1/2CX-100 B2-1/2CX-I100 B2-1/2CX-SS100
Overpressure rupture disc alarm and electrical systems with the highest level of explosion-proof electrical components ; make a whole set of equipment of the same type than imports more advanced spray drying tower spray drying granulation process : First, the slurry was milled in good further stirred tank is heated to above stir and 35 ℃, and then apply pressure to a stirred tank , under the pressure of the slurry is sent to the atomizer , atomizer atomizer spray after the tower from the bottom into the tower body. The gas turbine is sent to the heat exchanger top of the tower gas
Dispenser , after gas distributor uniformly form the tower into the cyclone -shaped , the atomized slurry was granulated and dried . After the pellets and the hot gas contact surface of the liquid will evaporate quickly , and the internal gas in a subsequent drying process to migrate to the surface of the hot gas is taken away . The dried pellets fall to the bottom of the tower , be recovered through a pair of gap-type butterfly valve . After drying the slurry gas containing a small amount of hexane, and after vaporization of fine dust , the gas is supplied to the first cyclone pressure blower , wherein the preliminary separation of dust , condensation , and then supplied to a column leaching . In the leaching tower , get into the gas sufficiently washed with hexane and the gas contained in the gas is condensed , collected in the bottom of the elution column , washed again through the gas oil is sent to a heat exchanger for heating a gas , are repeated use . During operation the system remains slightly positive pressure state by a delivery valve and one exhaust valve automatic control.
YBS would like to provide you the nozzle design ,samples and catalogue for free.
Ordering information of CX hollow cone spray nozzle(One-piece cast type) (YBS brand)
Thread: B=BSPT
Materials: None=brass
I=cast iron
SS=316 stainless steel
1 B1CX-7 B1CX-I7 B1CX-SS7
B1CX-8 B1CX-I8 B1CX-SS8
B1CX-9 B1CX-I9 B1CX-SS9
B1CX-10 B1CX-I10 B1CX-SS10
B1CX-12 B1CX-I12 B1CX-SS12
B1CX-15 B1CX-I15 B1CX-SS15
1-1/4 B1-1/4CX-10 B1-1/4CX-I10 B1-1/4CX-SS10
B1-1/4CX-12 B1-1/4CX-I12 B1-1/4CX-SS12
B1-1/4CX-14 B1-1/4CX-I14 B1-1/4CX-SS14
B1-1/4CX-16 B1-1/4CX-I16 B1-1/4CX-SS16
B1-1/4CX-20 B1-1/4CX-I20 B1-1/4CX-SS20
1-1/2 B1-1/2CX-16 B1-1/2CX-I16 B1-1/2CX-SS16
B1-1/2CX-20 B1-1/2CX-I20 B1-1/2CX-SS20
B1-1/2CX-25 B1-1/2CX-I25 B1-1/2CX-SS25
B1-1/2CX-30 B1-1/2CX-I30 B1-1/2CX-SS30
2 B2CX-30 B2CX-I30 B2CX-SS30
B2CX-35 B2CX-I35 B2CX-SS35
B2CX-40 B2CX-I40 B2CX-SS40
B2CX-45 B2CX-I45 B2CX-SS45
B2CX-50 B2CX-I50 B2CX-SS50
B2CX-60 B2CX-I60 B2CX-SS60
2-1/2 B2-1/2CX-60 B2-1/2CX-I60 B2-1/2CX-SS60
B2-1/2CX-70 B2-1/2CX-I70 B2-1/2CX-SS70
B2-1/2CX-80 B2-1/2CX-I80 B2-1/2CX-SS80
B2-1/2CX-90 B2-1/2CX-I90 B2-1/2CX-SS90
B2-1/2CX-100 B2-1/2CX-I100 B2-1/2CX-SS100