Samwon Tuksu Co., Ltd.
- Country / Year Established
- South Korea /
- Business type
- Others
- Verified Certificate
-
16
Product name | Injection Pump Double Line (SWDM-2000) | Certification | - |
---|---|---|---|
Category | Pumps | Ingredients | - |
Keyword | - | Unit Size | - |
Brand name | - | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | - |
Product Information
Injection Pump Double Line (SWDM-2000)
Feature
- liquid type high intensity polyurethane injection taking a short time to harden
Specification
- Mixture ratio : 1:1
- Feature : small, light weight Easy to work in the small place
- Plasmoptysis pressure : 350kg/cm2
- weight : 12kg
- Power voltage : AC220V, 60Hz
Urethane Foam Grout Instructions
No.
|
Image
|
Use.
|
|
01
|
Drill
|
Use a twist drill (10Ø) to drill holes at an interval of less than 20cm. At a depth of 6~10cm, drill at a 45 degree ngle along the side of the crack. | |
02
|
Insert Packer
|
Remove dust from the drilled holes and insert packers. Leave about 2cm from the injection site to easily remove packers at the end. | |
03
|
Tighten Packer
|
Use a T handle (10Ø) to tighten packers to firmly position the packers and to prevent the grout from leaking. | |
04
|
Urethane Foam Grout
|
Fill two-thirds of the injection pump with urethane foam grout and close the lid. | |
05
|
Begin Injection
|
Begin injection- Since the packers are installed at intervals less than 20cm, begin from one end to the other. Move from bottom to top for vertical cracks and from end points to the middle for horizontal cracks. | |
06
|
When Injecting
|
When injecting, start with a low pressure and inject until 10cm leaks out from both sides of the packer. Do not inject too much at once and insert the next packer before more injections. | |
07
|
Remove Packer
|
Use a hammer to hit the injection site of the packer to separate it from the wall. Since the packer is able to prevent reverse current flow, the urethane grout in the cracks will not leak out even with the removed packer | |
08
|
Cleaning
|
Use a urethane thinner followed by cleaning oil if you do not plan to use it again for a long time. Use only cleaning oil if you will be using it within a few days. Fill one-third of the injection pump for cleaning. You may use engine oil instead of cleaning oil. |
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- Dongil Kim
- Address
- 440-4 Sangdae-dong, Yuseong-gu, Daejeon, Korea
- Product Category
- Pumps
- No. of Total Employees
- 1-50
- Company introduction
-
Samwon Company has been devoted to water leakage, repair and reinforcement of concrete constructions since 1990. We have undertaken our constructions under the principle that we must be the best at repairing all defects from cleaves, water leakages of constructions 40m underwater to buildings, engineering works, installing of equipment. We have also been on observation tours abroad to study repair and reinforcement of constructions all over the world.
We will repay for your precious encouragement through experienced constructions and careful selection of materials.We are planning overseas expansion supported by our accumulated experience and know-how. We are aware that all of our achievements have been possible only through our customers' encouragement, which we will repay for by securing reliability in all our constructions.
- Main Markets
-
Malaysia
Taiwan
- Main Product