Double Slide Rail
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Keyword
- Category
- Other Construction Machinery
Aerotech Korea Co., Ltd.
- Country / Year Established
- South Korea /
- Business type
- Others
- Verified Certificate
-
17
Product name | Double Slide Rail | Certification | - |
---|---|---|---|
Category | Other Construction Machinery | Ingredients | - |
Keyword | - | Unit Size | - |
Brand name | - | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | - |
Product Information
Same like the other shoring systems also here the compatible rolling struts can be used and offer thereby a wide range of application.
When laying pipes with over length the rolling struts can be positioned staggered in height so that they allow the putting in of the pipes.
The usage of the Double Slide Rail Shoring takes place especially in deep trench constructions where high strut clearances are required and the terrain tends to settings. By bringing in a soil support also larger strut clearance heights can be made possible and with our patented adjustable clamping device even strut-free shoring pits are realizable.
Pits and trench ends can be closed all around by means of corner slide rails and shoring plates.
Standard Rolling Strut Slide Rail
Trench width: 1,99 - 12,00m
Strut clearance height: max. 3,60m
Plate lengths: max. 6,00m
Installation depth: up to 6,20m without top rails up to 9,00m with top rails
Mega Rolling Strut Double Slide Rail
Trench width: 1,99 - 12,00m
Strut clearance height: up to 4,30m
Plate lengths: up to 6,00m
Installation depth: up to 9,00m
Specificatioin
Year
|
Client
|
Construction CO.
|
Project Name
|
2006
|
SeoSan-Si | JeonU E&C Co. |
SeoSan-Si Sewer Pipe Maintenance Works |
KyungSan-Si | HanJin I&C Co. | KyoungSan-Si Sewer Pipe Maintenance Works | |
2007
|
Kimhae-si | Posco Construction Co. | Busan-Kimhae light rail transit |
KOGAS | Hyundai co. | KOGAS #13,#14 Plant works |
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- JI SUNG WHAN
- Address
- 6thFl., Hanshin IT TowerII, Gasan-dong, Geumcheon-gu, Seoul, Korea
- Product Category
- Hand Tools,Other Minerals & Metallurgy Products
- No. of Total Employees
- 1-50
- Company introduction
-
Putting the top priority to safety and environment based on "the spirit of respecting human being" at the construction site of each area, Korea Aero Tech intends to lead the innovation of construction culture in all sectors such as developing, designing, producing, leasing, selling and constructing all products.
Especially, in the area of provisional facilities for blocking soil in the underground excavation work for underground pipe and underground structure, we save the budget of customer and each constructor by perfect safety control and prompt processing control through our products and construction method so that they can create maximum profit. Further, we satisfy our customers by constructing competitive products with excellent quality in defense facilities of rock crush and other safety facilities which use steel liner plate in the area of road facilities.We promise that we will realize brilliant growth through incessant challenge toward world with ceaseless R&D as well as domestically/globally competitive products and unlimited total service spirit.
- Main Product
Related Products
Aerial Work Platform - Boom Lift Truck HS230
Hydraulic Breaker (Fine 20)
Aerial Work Platform - Boom Lift Truck HS300
Spare parts for all concrete pumps
5ton Press Packer