Distributerd Concentration (KaCo Model)
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Keyword
- Category
- Solar Energy System
Topsun Co., Ltd.
- Verified Certificate
-
12
Product name | Distributerd Concentration (KaCo Model) | Certification | - |
---|---|---|---|
Category | Solar Energy System | Ingredients | - |
Keyword | - | Unit Size | - |
Brand name | - | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | - |
Product Information
New xi-series :
Powador 2500xi - 5000xi (2.5kVA ~ 5kVA)
- New housing
- Aluminum profile
- Noiseless
- Redundant 3-phase monitoring by VDE0126-1-1
- RS232/RS485 convertible
- Grounded current protection
- High efficiency with non-transformer
- Convection cooling without cooling fan.
- Protection class IP54
- MPPT
- Kaco-LCD display standards
- SO-interface
- Signal at out of order
- Easy installation with plates.
Powador 30000xi - 50000xi (30 ~ 50kVA)
- Powador
- 10kw unit per phase
- 3 individual DC input, MPPT inside.
- AC-output : 30kW ...
- Maximum input : 36wp
- Independent outer box
- Weight
- Fan cooling by temperature controlling.
- 3-phase monitoring
- Grounded protection inside.
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- Yoon Jeong-taek
- Address
- 1060-8 Nampyeong-ri, Donghwa-myeon, Jangseong-gun, Jeollanam-do
- Product Category
- Primary & Dry Batteries,Solar Cells, Solar Panel
- No. of Total Employees
- 101-500
- Company introduction
-
※ TOPSUN's Features
- Founder was an ex-CEO of Symphony Energy(one of a leading pioneer in the solar industry)
- We are the only one in the world has capability to produce over 400Wp module
- Producing high efficiency module over 16%
※ By adopting 96 cell(over 400Wp)panel, you can have an advantage as follows
- Raw material cost for installation by about 5%
- Period for installation for about 1 week/MW
- System power loss mainly because the total length of the cables becomes much shorter
- Factory Information
-
Topsun Jangseong Factory
- Main Product