Scaffold walk board for shipyard / Building construction
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- Brand name
- POSCO C&C, DONG-BU STEEL, UNION STEEL
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Keyword
- scaffold, steel plank
- Category
- Ladders & Scaffoldings
Sechang Steel Co,. Ltd.
- Verified Certificate
-
16
Product name | Scaffold walk board for shipyard / Building construction | Certification | - |
---|---|---|---|
Category | Ladders & Scaffoldings | Ingredients | - |
Keyword | scaffold , steel plank | Unit Size | - |
Brand name | POSCO C&C, DONG-BU STEEL, UNION STEEL | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | 730890 |
Product Information
Scaffold walk board with innovative structure, high-tensile, and lightweight
DEVELOPMENT DETAILS OF STEEL PLANK FOR SHIPYARD
SIZE & WEIGHT
Material |
Size |
Weight |
|
SGC58 |
0.8mmx300mmx55mm |
2000mm |
10.1 Kg |
2500mm |
12.3 Kg |
||
3000mm |
14.6 Kg |
||
3500mm |
16.8 Kg |
||
4000mm |
18.9 Kg |
FEATURE
ㆍEasy to transport with lightweight ( Reduced its weight by 75% compared to existing products )
ㆍLoad capacity has been improved by reinforced muscle with triangle shaped forming.
ㆍLoad capacity has been improved by the new design of stiffened plate
ㆍㄷshape corner of closing plate is strongly attached to main body (stiffened plate) through it's insertion
in the body and welding
ㆍRubber packing is not easy to detach itself from main body. It has been inserted with cam lock
coupling type and fixed with staple pins.
ㆍProduct superiority (beautiful design and excellent safety) has been proved by publically certified
institution.
* Price : FOB Busan (negotiation with Mill's) + sea freight + commission + insurance premium
* Payment Term : T/T advance 20%, L/C at sight, L/C 90 days from B/L date
* Delivery Time : 45 ~ 60 days from L/C or Mill's option
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- PARK, SUNG-JOO
- Address
- 662 Gasul-ri, Daesan-myeon, Uichang-gu, Changwon-si, Gyeongsangnam-do, Korea
- Product Category
- Ladders & Scaffoldings,Steel Pipes,Steel Sheets
- No. of Total Employees
- 1-50
- Company introduction
-
1984 Dec. Foundation of Sechang Steel
Registered as a distributor of Union Steel (1984), Dongbu Steel(1985), POSCO C&C (1992)
1990 Dec. Foundation of Gwangju Office
1995 Jan. Conversion into a corporation
1999 Nov. Received Minister of Industry & Resources Award and Export Tower on National Trade Day, Acquired certification of ISO/KS A9002 (Gwangju Office)
2004 Nov. Received Minister of Commerce, Industry and Energy Award and Export Tower on National Trade Day
2005 Nov. Received Export Tower on National Trade Day, CEO received Prime Minister Award
2006 Dec. Designated as the front-runner in the strategic industry(machinery part) by Busan Metropolitan City
2007 Dec. Received Award of Excellence in Export from Busan Metropolitan city
2009 Jun. Foundation of Changwon plant & relocation of head office
- Main Markets
-
Cyprus
N.Zealand
Qatar
Turkey
U.A.E.
- Factory Information
-
SE CHANG STEEL
- Main Product
Related Products
PE Scaffolding Nets
Hot galvanized cuplock scaffolding system
Hydraulic cargo lift
aluminum ladder all made in korea
Cuplock System Scaffold