PVC TILE: Luminous Series

  • ◾ Price: Negotiable
  • ◾ MOQ: Negotiable

PVC TILE: Luminous Series

  • ◾ Price: Negotiable
  • ◾ MOQ: Negotiable

Specifications

Size - Weight - Stock -
Country of Origin South Korea
Production method Negotiable
Hs Code 3918101000

Trade Terms

Payment Terms D/A, D/P, L/C, T/T
Price(FOB) Negotiable MOQ Negotiable
Transportation -
Lead time Negotiable Shipping time Negotiable

Company

  • Country / Year Established
    • South Korea
    • South Korea / 1999
  • Membership
    • VIP
    Business type
    Manufacturer
  • Verified Certificate
    • 9
    • TRADE TOWER
  • Main Export Markets
    • Brazil Brazil
    • Cambodia Cambodia
    • China China
    • Ethiopia Ethiopia
    • Indonesia Indonesia

Product Description

PVC TILE: Luminous Series

Product Catalog / Brochure / Spec Sheet

PVC TILE

 

* Easy Construction                                  * Sophisticate & Fashionable Design                               

* Natural Texture of Wood                        * Easy Home Decoration          

* Excellent Durability & Abrasion              * Economic

* Easy to Clean Quick and Easy Install    * OEM Production Possible

 

 

Specification

 

- Size: 186MM X 940 MM / 7'X48'

- Thickness: 2.0MM / 3.0 MM

- Stuffing Q'TY (20FT): 3,800 M2 - 5,500 M2

- Origin: Made in Korea

 

 


 

 

INSTALLATION GUIDE

 

1. Please install according to installation guide.

2. Tile and adhesive must be kept in the same place for at least 24 hours before installation.

3. Make sure the subfloor is clean and clear of all debris or dust before installation.

4. The Floor should have a moisture reading of less than 75% RH.

5. Keep the tiles on the flat place in order not to wrap.

6. Please be sure the tiles are the same lot number and use our designated adhesives, according as floor conditions only.

7. Do not install over plywood or other PVC Flooring.

8. Maintain at constant temperature for at least 48 hours after the installation.

9. A sudden change in temperature by cooling or heating before the sufficient hardening of adhesive.

10. Concrete Subfloors: Must be dry, smooth, free from dust, solvent, paint, wax, grease, oil, asphalt.

11. Sealing compounds and other extraneous materials.

12. New Concrete Slabs: Must be thoroughly dry, at least six weeks old, and completely cured.

13. Concrete floors with a heating system: Be allowed as long as the temperature of the subfloor does not exceed 27℃ (80℉)


 


 

Membership Grade

BUYER

Biz Pro VIP

SELLER

Biz Pro VIP
팝업닫기
Live Chat A new message arrives
from a business partner.

No Data

  • There is no data to load
  • Check out the My TK > My Inquiries list.
  • After agreeing to the use of the Live Chat service, the list is printed only when there is at least one history of receiving or sending a Live Chat request.

If you have not yet agreed to use the Live Chat service,

You can use the Live Chat freely after agreeing to the use of the Live Chat service.

View more
View more