-
- South Korea / 1999
RC Level Rod
- ◾ Price: Negotiable
- ◾ MOQ: Negotiable
RC Level Rod
- ◾ Price: Negotiable
- ◾ MOQ: Negotiable
-
Required Quantity
-
Brand name-
-
Shipping / Lead TimeNegotiable / Negotiable
-
Keyword
-
Category
Specifications
| Size | - | Weight | - | Stock | - |
|---|---|---|---|---|---|
| Country of Origin | South Korea | ||||
| Production method | Negotiable | ||||
Trade Terms
| Payment Terms | L/C, T/T | ||||
|---|---|---|---|---|---|
| Price(FOB) | Negotiable | MOQ | Negotiable | ||
| Transportation | - | ||||
| Lead time | Negotiable | Shipping time | Negotiable | ||
Company
-
Country / Year Established
-
Membership
- VIP
Business typeManufacturer
-
Verified Certificate
-
10
-
-
10
Product Description
Product Catalog / Brochure / Spec Sheet
RC Level Rod
│ Description │
- Apply when a holding method for slabbing concrete is a plywood form.
- Depending on the thickness of slab, hold the bottom rebar with RC level rod or put nails on the plywood form to fix it and install them on 2m ~ 3m intervals. Adjust the level of the RC level rod and deposit concrete along the line of yellow discus.
- Level rod also works as a spacer that holds bottom rebar.
│ Specification │
│ Packing Unit │
│ Example of Construction │








